| |
| 1. Positive Material Identification (PMI) Equipment |
| 2. Factory Audit in Progress |
| 3. Type Acceptance Testing. |
| 4. Helium Leak Detection Test in Progress |
| 5. Factory Assisted Test witnessed by Client. |
| 6. Testing & Verifying Actual Flow Characteristics of the Valves |
| 7. Fire Test in progress |
| 8. Online Data Recording during the Type Acceptance Testing. |
| 9. Valve after Cryogenic Test |
| 10. Satisfied Inspector at Our Hubli Works |
| 11. Offshore spec painting being checked. |